HydroGeoSphere/Interpolation

From Wikibooks, open books for an open world
Jump to navigation Jump to search

Time-varying boundary conditions change abruptly from value bc_val(i) to value bc_val(i+1) at time bc_time(i+1). To have HydroGeoSphere use linear interpolation to smooth the values used between time panel endpoints use:

Interpolate[edit | edit source]

This command causes time-varying values to be interpolated between panel values for the boundary condition currently being defined. This results in a smoother application of the time-varying function.

• • •