This is a file from the Wikimedia Commons

File:Work Breakdown Structure and Schedule.gif

From Wikibooks, open books for an open world
Jump to navigation Jump to search

Original file(1,000 × 1,000 pixels, file size: 240 KB, MIME type: image/gif)

Summary

Description

Work Breakdown Structure and Schedule

The figure below presents the high-level WBS and schedule for the entire transition

This high-level WBS depicts the LCM phases occurring simultaneously throughout Stream 2 because that transition involves the modification of individual systems/applications to achieve ERKC. It is possible that some systems/applications will not require modification to be certified. However, most ERKC systems/applications will likely require some modifications.
Date
Source FBI Records Management Architecture: Transition Strategy
Author FBI

Licensing

Public domain
This image or file is a work of a Federal Bureau of Investigation employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, the image is in the public domain in the United States.

Deutsch  English  español  italiano  日本語  македонски  മലയാളം  Nederlands  português  русский  sicilianu  українська  中文(简体)  中文(繁體)  +/−

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

depicts

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current13:11, 19 March 2009Thumbnail for version as of 13:11, 19 March 20091,000 × 1,000 (240 KB)Mdd== Summary == {{Information |Description=Work Breakdown Structure and Schedule The figure below presents the high-level WBS and schedule for the entire transition This high-level WBS depicts the LCM phases occurring simultaneously throughout Stream 2 be